Service Gruppe der China-Welttechnologie-medizinischen Ausrüstung
Mit Gewinn für beide Parteien zusammen!
| Markenname: | GE |
| Modellnummer: | PM640509 |
| Min Bestellmenge: | 1 Stück |
|---|---|
| Preis: | USD |
| Verpackung Informationen: | Standard-Exportverpackung |
| Lieferzeit: | 3-5 Werktage |
| Zahlungsbedingungen: | T/T, Western Union, Paypal |
| Versorgungsmaterial-Fähigkeit: | auf Lager |
| Modell: | PM640509 | Marke: | GE |
|---|---|---|---|
| Produktname: | Power Management Board | Mindestbestellmenge: | 1 Stück |
| Material: | Metall | Garantie: | 90 Tage |
| Verwendung für: | GE PRO1000 Patientenmonitor | Zustand: | Gebrauchtes Original |
| Inventar: | auf Lager | Zahlungsmethode: | Paypal, T/T, Western Union |
| Versandart: | DHL, FEDEX, UPS usw. | ||
| Hervorheben: | GE PRO1000 patient monitor power board,patient monitor VGA video interface board,LC fiber optic interface monitor board |
||
GE PRO1000 Patient Monitor Power Management Board with VGA Video Interface and LC Fiber Optic Interface PM640509 94V
► Brief Description
The Power Management Board PN is PM640509, flame-retardant rated at 94V, and features a VGA video interface and an LC fiber optical interface. It is suitable for the GE PRO1000 Patient Monitor. This blue board is made of metal. It is responsible for converting external electrical input into stable voltages required by components such as the motherboard, display, and built-in recorder. It intelligently switches and manages between AC power and the built-in battery to ensure uninterrupted vital sign monitoring. The VGA video interface allows the monitor's display to be output to an external large-screen monitor or a centralized medical imaging system. The LC fiber optic interface primarily handles remote data transmission for the central monitoring system.
► Specifications
| Brand name | GE |
| Part Number | PM640509 |
| Product name | Power Management Board |
| Condition | In good condition |
| MOQ | 1 Piece |
| Payment Method | Paypal,T/T,Western Union |
| Use for | GE PRO1000 Patient Monitor |
| Color | Blue |
| Delivery | 3-5 Working Days |
| Warranty | 90 Days |
| Type | Spare part |
| Delivery Method | DHL ,Fedex ,UPS |
| Product Category | Patient Monitor |
| Power Supply Source | Electric |
| Use Place | Hospital ICU Clinic |
| Material | Metal |
| Product Characteristic | Functional,Durable in use |
| Packing | Carton |
| Inventory | In Stock |
►Detailed Photos
![]()
![]()
►function
1.Power Conversion and Supply: It converts 220V AC power into multiple DC voltages (such as +5V, +12V, -12V, etc.) required by the internal circuit modules of the monitor, providing a stable and clean energy source for the entire device.
2.Battery Charging and Management: This board is also responsible for charging the device's built-in battery and intelligently managing it. When AC power is disconnected, it seamlessly switches to battery power for the monitor, ensuring continuous operation during transport or power outages.
►Power Management Board Installation Steps
1. Power Off: Ensure the monitor is off and the power cord is unplugged from the AC power source.
2. Disassemble the Housing:
Use a suitable screwdriver to remove all screws securing the housing. Carefully separate the front and rear housings, being mindful of internal cable connections and avoiding pulling on the cables to prevent damage.
Locate the power board and disconnect all connectors associated with it, including the VGA video interface cable and the LC fiber optic interface cable.
3. Remove the Old Power Board: Once all screws on the power board have been removed, gently lift the power board upwards and remove it from the locating pins on the motherboard.
4. Install the New Power Board: Align the new power board with the locating pins: During installation, ensure the board is precisely positioned within the locating pins on the motherboard, aligning all interfaces and screw holes.
5. Connect all internal cables: Reconnect all connectors according to the original connection, including the VGA video interface and the LC fiber optic interface. Close the casing and install the screws.
6. Power-on test and verification
Connect the AC power cord, press the power switch, and observe whether the monitor starts normally.
If you have any questions regarding the GE PRO1000 Patient Monitor Power Management Board or need assistance with installation, please contact our technical sales team freely.
Ansprechpartner: Mia
Telefon: 86-15779588554